Zhangjiagang HuaDong Boiler Co., Ltd.

Zhangjiagang HuaDong Boiler Co., Ltd.

Manufacturer from China
Verified Supplier
9 Years
Home / Products / Boiler Economizer /

ASME Standard Boiler Economizer Banks Made Of Carbon Steel With Shields For Replacement And Maintenance

Contact Now
Zhangjiagang HuaDong Boiler Co., Ltd.
Visit Website
Province/State:jiangsu
Country/Region:china
Contact Person:MissSandy Chen
Contact Now

ASME Standard Boiler Economizer Banks Made Of Carbon Steel With Shields For Replacement And Maintenance

Ask Latest Price
Video Channel
Brand Name :HDB
Model Number :Boiler Economizer
Certification :ASME, EN, ISO9001, SGS
Place of Origin :China
MOQ :1 set
Price :Negotiable
Payment Terms :L/C, T/T, Western Union
Supply Ability :500 tons per month
Delivery Time :60~150 days
Packaging Details :Seaworthy packing
Porduct Name :Boiler Economizer Banks
Application :Maintenance and Replacement
Material of Base Tube :SA210A1
Keyword :Boiler Economizer
Production Technique :Tube Bending, Assembly
Packing :Steel Frame
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

ASME Standard Boiler Economizer Banks Made of Carbon Steel With Shields For Replacement and Maintenance​

Product Introdution

Economizer is a device installed at the lower part of the flue at the tail of the boiler to recover the waste heat of the exhaust gas. It heats the boiler feed water into a heating surface of saturated water under the pressure of the drum. Because it absorbs the heat of high-temperature flue gas, reduces the exhaust gas temperature, saves energy and improves efficiency, it is called an economizer.

Parameters of Boiler Economizer

Description Boiler economizer
Material of Base Tube SA210A1
Material standard ASTM
Dimension Customization
Weight

Min: 10 ton

Max.:1000 ton

Process Material→Tube Bending and Bevelling → Butt Welding→ Shield Manufacturing → Assembly 1 →RT→Handcuffs and Shields Welding→Assembly 2 →Hydro Test →Cleaning and Painting →Packing into Frames

ASME Standard Boiler Economizer Banks Made Of Carbon Steel With Shields For Replacement And Maintenance

Working Process of Boiler Economizer

There are three stages from the feed water in the boiler heated into superheated steam:feed water preheating, evaporation, and superheating. The three stages are finished on three different heating surfaces. The boiler steam and water circuit are composed of the three different heating surfaces as well as their connecting pipes. Boiler economizers are one of them, and it is right the equipment to preheat the feed water. Thus, it is the heating surface with the lowest temperature for boiler working fluid in the boiler steam and water circuit. The working fluid passing through this equipment is monophasic water(non-boiling economizer).

Company Profile

The products of our company have been widely used in major power plants of various provinces and cities in China, bringing stable and significant economic and social benefits to cooperated power plants. At the same time, we attach great importance to product development and strive to improve product quality. Through the cooperation with a number of domestic and foreign companies, we constantly explore the international market.

ASME Standard Boiler Economizer Banks Made Of Carbon Steel With Shields For Replacement And Maintenance

Inquiry Cart 0