Zhangjiagang HuaDong Boiler Co., Ltd.

Zhangjiagang HuaDong Boiler Co., Ltd.

Manufacturer from China
Verified Supplier
9 Years
Home / Products / Boiler Steam Drum /

Coal High Efficiency Water Tube Hrsg Steam Drum

Contact Now
Zhangjiagang HuaDong Boiler Co., Ltd.
Visit Website
Province/State:jiangsu
Country/Region:china
Contact Person:MissSandy Chen
Contact Now

Coal High Efficiency Water Tube Hrsg Steam Drum

Ask Latest Price
Video Channel
Brand Name :HD Boiler
Model Number :Steam drum
Certification :ISO9001 , SGS , TUV , ASME , EN
Place of Origin :China
MOQ :1 set
Price :Negotiable
Payment Terms :L/C, T/T, Western Union
Supply Ability :400 Tons per month
Delivery Time :50~100 Days
Packaging Details :Seaworthy Packing
Condition :New
Structure :Fire / Water Tube
Fuel :Coal / Gas / Coal-fired / Water heat
Type :Natural Circulation / Once Through
Specification :Customized
HS Code :3215960855
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Power Plant Boiler Steam/Water Drum for Industrial Boiler High Efficiency

Description


The boiler headers have water wall header, superheater header,economizer header and so on, it acts as collection, mixture, re-distributing working medium, as the structure, it can be classified as the end cover type( end enclosure) and necking down type.

The header is consisted of header body ( large diameter seamless steel tube ), end cover ( enclosure ) , tube joint, hand hole, thermomter socket and so on. And the welding checking is strictly proceeded as the welding process to guarantee 100% qualified products.

Drum is a cylindrical pressure vessel used for steam water separation and steam purification in water tube boiler to form water circulation circuit and store boiler water. Its main function is to receive water from economizer, separate steam and water, supply water to circulating circuit and deliver saturated steam to superheater. There is a certain amount of water in the drum, which has a certain amount of heat and working medium storage. It can slow down the steam pressure change speed when the working condition changes, and play a certain buffer role when the feed water and load are not coordinated for a short time. The drum is equipped with internal devices for steam water separation, steam cleaning, dosing in the boiler and continuous blowdown to ensure steam quality, as shown in the figure.

Drum is the most bulky and expensive thick wall pressure bearing part in boiler. The drum not only bears high internal pressure, but also generates thermal stress due to the variation of operating conditions and the fluctuation of wall temperature. Therefore, the working conditions are poor, and effective monitoring of operating conditions is needed.

Steam-water separation details


Primary steam-water separation removes nearly all the steam from the water so that very little steam is recirculated from the drum bottom towards the heated tubes through the outlet connection (downcomer).

At secondary separation, steam is passed through a secondary stage of separators or scrubber elements (usually closely spaced corrugated parallel plates) for final water droplet removal. Steam is then exhausted through various ports.

Coal High Efficiency Water Tube Hrsg Steam Drum

Product Name
Steam Capacity 6-30 tons of steam per hour
Boiler Power 30-1300hp
Working Pressure 1.25Mpa. 1.6Mpa, 2.5Mpa
Steam Temperature 193℃,204℃,226
Thermal Efficiency 95%
Operation Control Intelligent PLC Control

Company Introduction


Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.

1. Fabrication area of 200,000 square meters

2. 150 Engineers

3. 600 Coded welders

4. 60 Licensed Inspectors(NDT Level-III instructors)

5. Class-A Licenses for Design and Manufacture Boiler

6. ISO 9001:2008 Quality System

7. ASME Certificate of Power Boilers

8.ASME 'S','U' and NB stamp authorization

Design and Manufacturing capacity


1. Two automatic coiler production lines

2. Hot bending to minimum bending radius 0.6D

3. Membrane wall tube bending , with horizontal and vertical panel bending machines

4. Panel fabrication for up to for 1000MW power plant boilers

5. Fabrication of CFB Boiler Cyclone Separators

6. Fabrication of Header to Chinese standards(GB), US standards (ASME), or EU standard (EN)

7. Broad range of heat treatment equipment including 10 furnaces, offering normalizing and tempering

Inquiry Cart 0