Zhangjiagang HuaDong Boiler Co., Ltd.

Zhangjiagang HuaDong Boiler Co., Ltd.

Manufacturer from China
Verified Supplier
9 Years
Home / Products / Boiler Manifold Headers /

Industrial Steel Electric CFB Boiler Manifold Headers Low Pressure Water Tube Structure

Contact Now
Zhangjiagang HuaDong Boiler Co., Ltd.
Visit Website
Province/State:jiangsu
Country/Region:china
Contact Person:MissSandy Chen
Contact Now

Industrial Steel Electric CFB Boiler Manifold Headers Low Pressure Water Tube Structure

Ask Latest Price
Video Channel
Brand Name :HD Boiler
Model Number :Header
Certification :ISO9001/SGS/TUV/ASME/EN
Place of Origin :Zhangjiagang,Jiangsu,China
MOQ :1Set
Price :Negotiable
Payment Terms :L/C, T/T, Western Union, D/P, MoneyGram
Supply Ability :100 Tons/Month
Delivery Time :30 Days
Packaging Details :Seaworthy Packing
Condition :New
Structure :Fire/Water Tube
Fuel :Coal/Gas/Coal-fired/Water heat
Type :Boiler Part
Pressure :Low/High Pressure
Range of Applications :Industrial/Power Station
Specification :Customized
Manufacturing Level :A
Surface Treatment :Painted
HS Code :3215960855
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Low Pressure Steel Electric CFB Boiler Header Boiler Steam Header Water Tube Structure

Product Description


Headers form an important part of all types of boilers. Steam from the generating tubes is collected in headers which are therefore always under pressure. This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them. Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header.

Process


The critical point to manufacture the end cover of steam trap boiler economizer header is the welding process. We adopt the advanced manufacture process, the complete large sized device and mature technology, especially the welding of the end cover with the boiler part header, we adopt the auto submerged welding, this welding method exists the high manufacture efficiency, good quality, the artistic welding appearance, safe and reliable operation.

Technical parameters of customer design boiler pressure parts header for CFB boiler

Diameter(OD) ¢76mm~¢914mm
Length(Max) 23000mm
Temperature(℃) 300~1500

Industrial Steel Electric CFB Boiler Manifold Headers Low Pressure Water Tube Structure

Material


1. Carbon steel:20G,SA-106B,SA-106C,etc.

2. Low-alloy thermal resistant steel:15CrMoG,12Cr1MoVG,SA-335P12,SA335-P22,etc.

3. Middle-alloy thermal resistant steel:SA-335P91,etc.

4. Special material(ultra-supercritical):SA-335P122,SA-335P92,etc.

Workshop

Industrial Steel Electric CFB Boiler Manifold Headers Low Pressure Water Tube Structure

Certifications


Industrial Steel Electric CFB Boiler Manifold Headers Low Pressure Water Tube Structure

Competitive Advantage


Quality control and management to the whole produce process, including ingot smelting, hot-rolling, heat treatment, machining and strictly final inspection prior to delivery.
Excellent product quality and service, competitive price, “in-time” delivery

Industrial Steel Electric CFB Boiler Manifold Headers Low Pressure Water Tube Structure

Inquiry Cart 0